OASIS FORUM Post by the Golden Rule. GoldTent Oasis is not responsible for content or accuracy of posts. DYODD.

Ipso. ohio has 200 data centers today

Posted by overton @ 22:55 on July 30, 2026  

And they are building 80 more. My electric bill went from 3 cents a kilowatt to 11 cents a kilowatt in less than 3 years. Home prices increased 70% in that same time period.

What does a data center actually sound like?
A hyperscale data center produces several distinct noise sources, all running 24 hours a day, 365 days a year:

Cooling towers and HVAC stacks — the largest continuous source. Typical property-line measurements range from 45 to 65 decibels (dBA) at the residential boundary, with the dominant frequency in the 100–500 Hz band. This is the “hum” residents describe.
Substation transformers — the 60-Hz hum of high-voltage equipment, typically 50–65 dBA at 50 feet from the transformer.
Diesel backup generators — not used continuously, but tested monthly. A typical 2-megawatt diesel generator produces 90–105 dBA at 25 feet during a load test, which is comparable to a chainsaw.
Construction noise — intermittent during the 2–5 year build phase, including pile-driving, concrete pours, and crane operations.

No Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.

Go to Top

Post by the Golden Rule. Oasis not responsible for content/accuracy of posts. DYODD.