
The Swiss tired of a tortuous route over the mountain to Italy,
so they bored the Gotthard Base Tunnel UNDER the mountain
for this high speed line.
http://www.railpictures.net/photo/665739/
How is President Trump doing? With a one being worst and a ten the best.
Total Voters: 36

The Swiss tired of a tortuous route over the mountain to Italy,
so they bored the Gotthard Base Tunnel UNDER the mountain
for this high speed line.
http://www.railpictures.net/photo/665739/
No comments yet.
RSS feed for comments on this post.
Sorry, the comment form is closed at this time.