OASIS FORUM Post by the Golden Rule. GoldTent Oasis is not responsible for content or accuracy of posts. DYODD.

goldielocks 1:31

Posted by goldcountry @ 10:04 on February 13, 2017  

Jim Stone has been saying from day one that the spillway damage was intentionally done and that the dam would fail. But he does tend to look on the dark side. Now they have suspended the domain name on his site, so only direct IP addresses will work. This has not happened to him before, and he thinks it’s because he’s right about the sabotage.

“There were a few readers who said I reported about the dam too much. I kept on it, because I strongly believe the spillway failure was sabotage. And I did not think they would sabotage the spillway unless they had run endless 3d modeling proving an absolute failure would result. I was confident this failure was the end result of careful modeling and sabotage to make it happen, but did not say it because it sounded too “out there”.
And now, TOO BAD, I’D RATHER BE WRONG but now the emergency spillway is failing also, because it is just too much water to run over a damaged dam. I believe communists in California’s government blew the primary spillway up with explosives. After that, nature would finish the catastrophe. And I believe they carefully planned this out fully, complete with ground penetrating radar scans to prove there would be a horrible end result. That is the type of people that are running California now, I would not put this one inch past them.

Whatever happens now all depends upon how strong the rock in the mountain is that all of this water is going to flow over if the emergency spillway does give out completely. Hopefully we will only lose the top 50 feet of water, and not all 770 feet of it. ”

No Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.

Go to Top

Post by the Golden Rule. Oasis not responsible for content/accuracy of posts. DYODD.